Demonstration catalog

Every Package Date on this site was entered as an example, to show how the portal works. No venue has been asked for these dates, and none has acknowledged them. A Booking made here holds nothing.

Ocean Systems Day

A working ocean-research campus and a travelling aquarium lab, in one day, on one bus. Students spend the morning at AltaSea and the afternoon with Cabrillo Marine Aquarium’s mobile aquarium, which comes to them.

The day

Departs school 9:00 AM, returns 2:00 PM. The bus makes one stop.

This package works for schools up to 15 minutes from San Pedro each way.

Any further and the bus cannot be back by 2:00 PM.

Timings are the venues’ own published windows.

  1. 9:00 AM

    Depart school

  2. 10:00 AM – 12:00 PM

    AltaSea K-12 Field Trip

  3. 12:00 PM – 12:45 PM

    Lunch

  4. 12:45 PM – 1:45 PM

    Cabrillo Ocean Outreach (mobile aquarium)Cabrillo Marine Aquarium comes to the group

  5. 1:45 PM

    Depart for school

What students do, and who invoices

AltaSea K-12 Field Trip

AltaSea at the Port of Los Angeles

Cost
No charge
Invoiced by
Not Published
Maximum students
Not Published

Cabrillo Ocean Outreach (mobile aquarium)

Cabrillo Marine Aquarium

Cost
$195
Invoiced by
Cabrillo Marine Aquarium
Maximum students
30

Where the bus goes

Where the bus goes is the one question no venue on this waterfront answers on its own website. Thirty-eight pages across all four venue sites and seven intake forms were read on 20 August 2026, and the only occurrence of the word “bus” in any of them was a line about scholarships. So this section publishes the few arrival facts a venue has actually put in writing, says Not Published everywhere else in those words, and names the desk to ask. Nothing here is permission to park: no venue has stated where a school bus may stand, and an absence of a published prohibition is not the same as being told yes.

AltaSea at the Port of Los Angeles

Where a bus goes at AltaSea at the Port of Los Angeles is Not Published. Nobody there has put a drop-off point or a parking arrangement in writing, and this site will not invent one.

Call the venue before the day. Two questions decide a morning and neither is published anywhere: where the driver sets the group down, and whether the lot is open when you arrive. Where a venue publishes no desk of its own, this page says Not Published rather than printing an address that may reach nobody.

Roadworks across the pilot year

San Pedro is a construction site for the whole of the 2026-27 school year, and roadwork guidance that has gone stale is worse than none — the Los Angeles Maritime Institute’s own boarding page still carries a ramp advisory that expired around December 2025. So every advisory below carries the end date its own source states, and where a source publishes none this page says Not Published instead of picking one. All three were read on 20 August 2026; check the source before you plan a route around one.

Published roadworks between the freeway and the waterfront
What is closedWhat it means for a busEndsPublished detour
SR 47 northbound ramps at Harbor Boulevard are closedThe northbound SR 47 on-ramp and off-ramp at Harbor Blvd are shut while the interchange is rebuilt. Traffic coming south on I-110 towards the waterfront is what this affects.31 October 2026DETOUR A: SB I-110 to Harbor Blvd. Exit at Channel Street/Pacific Ave. and continue to Front Street/Harbor Blvd.
The Vincent Thomas Bridge closes completelyCaltrans is replacing the bridge deck and closing State Route 47 for sixteen months from about 1 November 2026. That severs the direct road link between San Pedro and Long Beach for the whole pilot year, which is why this catalog offers only the brigantines berthed in San Pedro.Not PublishedNot Published
Harbor Boulevard is rebuilt from S.P. Slip to 22nd StreetThis is the corridor linking Battleship IOWA, the LAMI dock and the route south towards Cabrillo. The work spans the entire pilot school year.January 2028Not Published
  • SR 47 northbound ramps at Harbor Boulevard are closedThe Port of Los Angeles interchange project page, which states “The northbound SR 47 on-ramp and northbound SR 47 off-ramp at Harbor Blvd. will be closed through Oct. 31, 2026” and publishes Detour A word for word. The Port does not state that Detour A is an instruction for buses. The project’s own estimated completion is December 2026, so the advisory set will change before then. Its traffic line is (310) 732-7778. Read 20 August 2026.
  • The Vincent Thomas Bridge closes completelyCaltrans District 7 states the full closure is “scheduled for November 1, 2026” and the Port of Los Angeles states “late 2026”, for sixteen months; both say the schedule may change. No detour has been published for the full closure — the routing Caltrans has published applies to the earlier night-time lane closures, not to this — so the end date and the detour are both Not Published. Read 20 August 2026.
  • Harbor Boulevard is rebuilt from S.P. Slip to 22nd StreetThe Port of Los Angeles Harbor Boulevard reconstruction schedule, November 2026 to January 2028. No detour is published for it. Read 20 August 2026.

What happens after you hold a date

Holding a date here is not a venue agreeing to it. Each venue runs its own intake and contacts you directly. Below is what each one does next, as far as each venue has said so — and where a venue has not described a step, this page says Not Published rather than guessing at one.

AltaSea at the Port of Los Angeles

What they do next
AltaSea runs its field-trip intake in its own scheduling system, Acuity, separately from this site. Someone at AltaSea picks the request up there.
What they will send you
An email from AltaSea, direct to you.
What you have to send back
Whatever AltaSea’s own Acuity intake asks for. Not money — this field trip carries no fee, and AltaSea’s own system is not set up to collect one.

AltaSea described its own intake at the network kickoff on 20 August 2026, and its live scheduling system reports no payment processor connected.

Cabrillo Marine Aquarium

What they do next
Cabrillo runs its own intake on its own forms — a different one for each programme, five of them live at once.
What they will send you
Not Published
What you have to send back
Cabrillo’s own form for the programme whose date you held. It asks between 20 and 39 questions — far more than this site collects — and nobody here can fill it in or send it for you.

Five separate live Cabrillo booking forms were counted, and their fields tallied, on 20 August 2026.

Available dates

Every date below is a Thursday, and each is still outside the 30-day cutoff. Dates that have been taken are not listed.